Day 11 of EIFS installation. Today the top coat is being applied. We are doing marble coat 1.0 finish in Winter White. Here’s the finished product after the top coat is finished.
North-west corner.
Back of the house
3rd floor west side.
3rd floor east side.
Everything went well. But the contractor coated my foundation wall white too. I wanted the foundation wall to be in concrete colour. So they will come by later to colour it back to the concrete color.