Finally my new water and sewer connection is schedule with the city. Today the contractor from OJCR came on site to take a look. The work will be carried out over the next two days. Today they get out the concrete cutter and cute out the concrete and asphalt that they will have to dig out later. This is a brand new water and sewer connection so they will have to cut all the way into the road where the main sewer is.
This is the trench they will be digging for the new sewer connection. It goes all the way through my drive way.
This is where the new water service will be installed.