More framing done. Today all the basement windows are installed. This one below is the one on the west side.
These are located on the south side.
And a few area to fix up the framing. Here just to the right of the steel post, a stud was cut out to fit the line set run you see on the top. I got the framer to put it back because I probably will need when I want to secure things on the wall.
And here in the middle, framing is change a bit so that there’s a big wide space on the top. This is where my kitchen hood duct will go. It will be an 8″ size duct so I need that big clearance so that I won’t run into issues later.