More electrical work this weekend. Missing conduit and low voltage bracket in the living room is installed.
The conduit in the bedroom is finally corrected so that the conduit goes all the way through the 2×6 stud instead of inside the 2×2 strapping that will block the spray foam.
A couple of vapour box will block spray foam installation. So they are temporary taken down.
The rear exterior lighting is fixed so that they are now evenly spaced.
All exterior sockets and lighting connections all have their boxes installed.
And in the mechanical room, some of the wires are finally installed to the panel.