More electrical work. This time we are adding low voltage lines for the HRV control and the furnace control. This is the main HRV control just outside of the mechanical room in the basement.
This is the furnace control on the first floor in the office area.
And these are the HRV 20/40/60 control in the bathrooms.
Leave a Reply
You must be logged in to post a comment.