AV Mechanical is here to do more plumbing work. Here the shower tub drain is installed and the tub filler is secured.
The linear drain for the master bathroom is relocated to the side and secured.
And basement bathroom’s outlets are installed and the linear drain is also installed.
With those plumbing work done. I also completed the KERDI boards in the basement.
In the second floor bathroom, then I put the ceiling panel up.
Then I’ve also started to put the KERDI bands over the fasteners in the 2nd floor bathroom.