Plumbing day 9

AV Mechanical is here to do more plumbing work. Here the shower tub drain is installed and the tub filler is secured.

Plumbing

The linear drain for the master bathroom is relocated to the side and secured.

Schluter Systems

And basement bathroom’s outlets are installed and the linear drain is also installed.

Schluter Systems

With those plumbing work done. I also completed the KERDI boards in the basement.

Schluter Systems

In the second floor bathroom, then I put the ceiling panel up.

Schluter Systems

Then I’ve also started to put the KERDI bands over the fasteners in the 2nd floor bathroom.

Schluter Systems

d

Schluter Systems

 

Leave a Reply