Finished up all the needed plastic sheets for the interior soundproofing.
Found that there’s a missing device box for the vanity light in the 2nd floor bathroom. So installed one there.
The mechanical system is scheduled to be installed. So decided to finish up all the electrical works there. This is a receptacle at the electrical panel.
This is the receptacle for the hot water heater.
This is the receptacle for the sump pump.