Today, I started on doing batt insulation over the spray foam. The spray foam for the 1st & 2nd floor walls is about 1.5″ – 2″ thick just filling the 2×2 stud space. The 2×6 studded wall cavity will be filled with R22 Roxul batt.
Here I started on the east side wall.
With the big window and the door, there are very few cavities to be filled in the east side wall.
This corner is important as now it is completed and the HVAC duct work can continue.
This is how much I have completed in the kitchen.