Since cutting the Roxul ComfortBoard is such a slow work, I decided to tackle it a bit over the weekend.
So after 2 days of hard work, the north wall is done. Here’s the 1st floor on the west side. The 2×2 stud space are all filled. A few 2×6 wall cavities are also filled.
First floor north wall, this is in the middle around the stair opening. The 2×2 stud spaces are completed filled.
And the north wall on the west side. The 2×2 stud space are all filled, even the 2×6 wall cavities are partially filled.