More batt insulation installation on the 2nd floor.
Finally finished the south wall in the bathroom. So the bathroom is now completed.
Then we continued on with the 2nd floor. Here’s the open area on the 2nd floor.
We finished up most of the 2nd fllor with the only area missing being the ones over the open to below area. Will need to use the scaffolding to complete these.