Work on the deck continues today. The deck boards are now being installed as well as the two guardrails on both side of the deck.
Guardrail on either side of the deck.
The deck boards. The deck boards is long enough so that single piece of deck board runs the entire length of the deck. The deck boards are installed using hidden clips.
Here’s the hidden clips looks like. It clips deck boards from both side and ensures proper spacing between the deck boards.
Leave a Reply
You must be logged in to post a comment.