Framing day 8

Framing day 8. Today the crew worked on the second floor wall. They have finished the east wall and 2 panel of walls to the north and 1 panel of wall to the south. Tomorrow they will continue to work on the walls and the front shade. The west side wall will be the last to get done because that’s where they use their forklift to bring in the material.

This is the wall to the north that was finished. You can also see a part of my wall to the east that will contain a sliding door and a large window.

Second Floor Wall

And here is the wall to the east which has a lot of glazing and the wall to the south that was completed.

Second Floor Wall

And here’s an unfinished wall lying on the floor.

IMG_1389

Good new is that the framer was able to remove bolts from the steel beam that was not level. They jacked the beam up, supported it underneath with a few wood beams and then finished the work up there. So what I need the guys from AMX Steel is to just weld the steel beam in place. They now say they will be here on Tuesday to fix it.

Time-lapsed sequence of the day.

Leave a Reply