Framing day 9

So today right on schedule most of the second floor wall has been finished. The front shade is also framed. However, AMX Steel is no show and so the steel beam is not yet welded in place. But at least it is not impacting the framing. Tomorrow is a raining day so no work will be done on site.

At the end of the day, this is what the north and east side wall looks like from the outside.

Second Floor Wall

Here’s the south side wall from the outside.

Second Floor Wall

From the inside of the house, here’s what the south side wall looks like.

Second Floor Wall South Second Floor Wall South

And here’s what north side walls looks like from the inside. You ca see there’s no windows or opening of any kind on the north side.

Second Floor Wall North Second Floor Wall North

They also finished framing the front shade. From here, it almost looked like a small balcony.

Front Shade

And here’s what it looks like from agove and from below.

Front Shade Front Shade