Day 17 of framing. Today most of the remaining parapet wall is done with the exception of the west side which is still being left open so that materials can be transported easily using the fork lift.
This is the north-east corner. All the parapet walls are erected all the way between my 3rd floor structure and the steel beam that will secure the glass guard rails.
This is the parapet wall to the south. All erected from the beam from the steel beam that will secure the glass guard rails all the way to the west end of the house.
And here’s the actual 3rd floor structure. As you can see it’s basically a cover for the stair opening. I have windows and sliding door glazing all over the east side as well as the south side.
Leave a Reply
You must be logged in to post a comment.