Header in a fire rated assembly

The north wall has to be fire rated. Here in Toronto, the requirement for header in a fire rated assembly can be satisfied by having 5/8″ Type-X drywall installed next to the rim board. The 5/8″ Type-X drywall provides 40 minutes of fire-resistance ratings. Add the rim board and the plywood and we will get the required 45 minutes fire-resistance rating that’s required.

Fire rated wall  Fire rated wall

Scaffolding

Bought a set of scaffold from Home Depot. I wanted to do some insulation work myself. So scaffold will allow me to work on the opening area where the walls are two stories high more safely. These 6′ units can be stacked on top of each other to create an 12′ high scaffold. It also came with guardrails for the top.

Scaffold

I also bought screw jack legs for the scaffold so that they can be setup on uneven ground. I am using it already for my window caulking work which is still ongoing.

Scaffold

Electrical rough in day 11

More electrical rough in work today. Since I removed the soffit last weekend, the wires for the soffit lights are now ran.

Electrical rough in

Continue reading ‘Electrical rough in day 11’ »

Caulking windows

I decided to caulk all the windows myself instead of getting some contractor to do the job. And because I choose a white exterior colour with black window frame, the caulking becomes a slightly more complicate job because you want to make sure the caulking lines are crisp. I am using LePage QUAD White Sealant to caulk my windows. So first, I use painter’s tape and tape up all the window frames.

Caulking windows

Continue reading ‘Caulking windows’ »

Soffit & windows

More sweat equity work today. Went up to the 3rd floor and removed the soffit installed. This way the electricians can run the wires for the soffit lights.

Soffit

Continue reading ‘Soffit & windows’ »

Plumbing rough in day 8

Plumber came to do some rough in work for the ductless condensation drains. We are putting all drainage of the ductless inside the walls so that it is neither visible from inside nor outside. Here in the basement all the ductless condensation lines are drained to the floor drain behind the stairs.

Pumbing rough in

Continue reading ‘Plumbing rough in day 8’ »

Natural gas connection

The locate for the natural gas utility line is done. Hopefully Enbridge will schedule the installation of the gas line soon.

Utility locate

Basement window

There are quiet some big gaps between the foundation wall and the basement windows, so when I found some time, I decide to foam up the basement window myself. Just like the rest of the house, I used Great Stuff Window & Door Insulating Foam from Home Depot and filled up all the gaps.

Basement window

Continue reading ‘Basement window’ »

Electrical rough in day 10

Electrical work continues. This is the switch in the kitchen which will control 3 independent set of lights in the combine kitchen / family room area.

Electrical rough in

Continue reading ‘Electrical rough in day 10’ »

Basement stairs

Today the basement stairs is delivered and installed. Here you can see the stairs wrapped in protective plastics.

Basement stairs

Continue reading ‘Basement stairs’ »