Cedar day 1 & 2

Carlos’s crew from Pleasant Homes Construction is here to install the cedar siding. I’m having clear cedar siding installed under the front shade, under the rear balcony and at the south-west corner.

Here’s what the have done so far on the front. There was a bit problem on the side, the recessed light was too close to the plywood that the siding cannot be installed. There’s about 1″ of space to move towards the outside, and after that move, it barely made the cut.

Cedar

Continue reading ‘Cedar day 1 & 2’ »

Metal siding day 3

Tom and Kevin from Resco Roofing is here today to finish the metal sidings and some other left over sheet metal works.

For the metal siding, a Z flashing / drip edge is installed right on top of the EIFS overhang. Then the metal siding goes on top of it.

Metal siding

Continue reading ‘Metal siding day 3’ »

Metal siding day 2

The work on the metal siding continues today. On top of the sheet metal work, I’ve also asked the roofer to lower the roof drain properly to the plywood level so that the roof drain doesn’t protrude above the roof line. Here is all the metal siding installed on the inside of the parapet wall on the south and west side. Most of the capping on the south side is done.

Metal siding

Continue reading ‘Metal siding day 2’ »

Metal siding day 1

While the city contractor is working on the new water / sewer connection, Tom Resco of Resco Roofing is here to install my metal sidings. These corrugated steel panels will be installed on both the inside and outside of the parapet wall. Here’s some installed on the inside of the parapet wall.

Metal siding

Continue reading ‘Metal siding day 1’ »